Disaster recovery test plan template

A recovery test without a plan proves little and risks much. This template defines what a test plan contains so that the exercise is safe, measured and repeatable, and so that its results count as evidence.

01Observe02Fortify03Verify04Evidence05Sustain

How to use it

Before the first step.

  • Start with isolated restores and build toward full service recovery.
  • The success criteria are the recovery objectives, not the completion of steps.

Steps

Each one owned and evidenced.

#StepOwnerEvidence
01Objectives: which systems, scenarios and objectives the test examines.IT leadObjectives statement
02Scope and boundaries: what is tested, what is simulated, what is out of scope.IT leadScope statement
03Scenario: the failure being simulated, from single-system loss to site loss or attack.IT leadScenario description
04Roles and participants: who performs, who observes, who decides on abort.IT leadRole list
05Success criteria: recovery time and recovery point per system, functional checks, data integrity checks.IT lead with business ownersCriteria table
06Procedure: ordered steps with dependencies, drawn from the recovery plan.IT operationsStep list
07Safety and rollback: how production is protected and how the test is unwound.IT leadSafety plan
08Measurement: what is timed and recorded, by whom, at which points.ObserverMeasurement sheet
09Results: measured values against criteria, failures, observations.ObserverResults record
10Actions and sign-off: gaps, owners, dates and acceptance of the results.IT lead with sponsorAction list and sign-off